Prescribed standard installation
A Prescribed Standard Gas Installation is an installation:
- in a *class 2 or *class 4 building exceeding 3 storeys; and/or
- with more than one meter where the meters are located in a common area
*within the meaning of the Building Code of Australia
Class 2: a building that includes more than one dwelling, each of which is generally solely occupied by one or more people to the exclusion of others
Class 4: applies to some types of accommodation within a *class 5-9 building (i.e. caretakers flat within a building or accommodation over or otherwise connected to a shop)
The gasfitter must complete the following
- Application for acceptance before commissioning
- installations marked by an asterix (*) on the gas fitting notice require an APPLICATION to the Director of Gas Safety for ACCEPTANCE before commissioning.
- must complete the gas consumers details, details of qualified gasfitter, notification of gas installation and details of work undertaken sections.
- forward the yellow copy of the gasfitting notice with the appropriate APPLICATION for ACCEPTANCE to Workplace Standards Tasmania a minimum of fourteen days prior to commissioning of the installation.
- Do not sign the statement or certificate of compliance.
Statement of compliance
- must ensure that the work on the accepted installation has been carried out in accordance with any relevant standard or condition specified in the ACCEPTANCE
- the signed white copy of the Statement of Compliance to the Director of Gas Safety.
- within 48 hours of undertaking the work provide the green copy to the person on whose behalf the work was carried out or the owner of the gas installation
- the blue copy to the gas supplier.
- must keep the pink copy for at least 5 years
Forms:
Application for acceptance complex/prescribed installation (TBA003)
Statement Of Compliance - Type B Gas Appliance (TBA004)
Sample of a Gas fitting notice (GFN001)
Installation approval and gas fitting notice requirements